Hotel FF&E Installation Services in California
Full-service FF&E and OS&E installation for whole hotel projects, from the 53-foot trailer to the finished room. Receiving, storage, delivery, installation and punch under one contractor.
Request a bidCall 408-647-7163Call David: 415-660-0194Hotel FF&E installation is the receiving, delivery, assembly and placement of a hotel's furniture, fixtures and equipment, and OS&E installation covers the operating supplies and equipment that go into the same rooms. Doneright is a full-service installer for whole hotel projects in California: guestrooms, lobbies, gyms, poolside areas, conference rooms, banquet rooms and ballrooms. We unload the trucks, document any freight damage, store the goods in our Stockton warehouse, deliver on your schedule with our own trucks, and install room by room until punch is closed.

Doneright Contracting has been in business since 1998, has served hotels since 2000, and is a California licensed and bonded contractor (license #925457). Our office is at 680 Mission St in San Francisco, and incoming FF&E and OS&E are received at our 80,000 sq ft warehouse in Stockton.
What our FF&E installation services cover
We can take the entire package for a renovation, PIP, conversion or new opening, or a defined part of it. Areas we install include:
- Guestrooms and suites: beds and headboards, casegoods, seating, tables and the rest of the room package.
- Lobbies and public areas: lobby seating, tables, consoles and public-area furniture.
- Gyms: fitness-room furniture and equipment placement within the agreed scope.
- Poolside areas: loungers, tables, chairs and other outdoor pieces.
- Conference rooms, banquet rooms and ballrooms: meeting furniture, banquet tables and chairs, and ballroom pieces.
- OS&E: operating supplies and equipment placed per the property's OS&E list.
Window treatments can be added through hotel drapery and window treatment installation, and in-room appliances such as mini-fridges, microwaves and PTACs through hotel appliance removal and installation.
From 53-foot trailer to finished room
Most installation problems start at the dock, so we control that part ourselves. We unload 53-foot trailers and shipping containers at our Stockton warehouse with forklifts on site, photograph and document any damage as freight comes off the truck, and report it so it can be resolved before install day instead of in a guestroom. The warehouse has alarm and video surveillance. Goods are held until the property is ready, then delivered in the order the rooms are released, using our own delivery trucks, with more runs scheduled when the volume calls for it. Details are on the receiving and warehousing and logistics and delivery pages. Manufacturers shipping into California can also see our manufacturer partner page.


Our FF&E installation process
- Plan. We review the FF&E and OS&E schedules, room types, layouts, shipping dates and the room-release calendar with the owner, designer, purchasing agent or general contractor.
- Receive and document. Shipments are unloaded in Stockton, and freight damage is photographed and documented on arrival.
- Store and stage. Goods are held in the warehouse and staged for delivery by floor, phase or room type.
- Deliver. Trucks are loaded to match the rooms being released, so the hotel is not buried in boxes.
- Install. Crews unpack, assemble and place each item to the approved layout, room by room and space by space.
- Room checks and punch. Rooms are checked before they are turned over, and open items are tracked to closeout through punch and turnover.
- Remove the old FF&E. If the project includes it, the existing furniture comes out ahead of the install, and qualifying pieces are credited toward your project.
Phased installs in operating hotels
Most renovations happen while the hotel is selling rooms. We work in the blocks of rooms or floors you release, keep corridors and elevators clear for guests, and return rooms to inventory as they pass room checks. Ballrooms, meeting rooms and restaurants are scheduled around the event calendar, and poolside areas around the season and weather. One crew can clear the old furniture, install the new package and close punch, which removes a handoff between vendors.
A hotel renovation contractor for the FF&E scope
Owners and general contractors who search for a hotel contractor in California often need one firm to handle everything that moves in and out of the rooms. Doneright is a licensed and bonded California contractor (license #925457), in business since 1998 and in hospitality since 2000. On a hotel renovation we take the FF&E and OS&E side: removing and liquidating the old package, receiving and storing the new one, delivering it and installing it through punch. We work alongside the general contractor and the trades.
Overnight and graveyard-shift removals are available when the hotel needs rooms back fast, and weekend and after-hours removals can be scheduled around guests.
Choosing between FF&E installation companies
When you compare FF&E installation companies for a hotel project, ask who receives and stores the freight, how damage is documented, whether the installer owns its trucks, whether OS&E is included, and who removes the old furniture. Doneright answers all of those in one scope: our own Stockton warehouse, documented receiving, our own trucks, FF&E and OS&E installation, and hotel liquidation of the existing furniture with qualifying value credited toward your project.
What drives FF&E installation cost
There are no published rates. Every bid is built from your FF&E schedule and property, and the main cost drivers are:
- Room count, room types and the number of items per room.
- Public spaces in scope: lobby, gym, poolside, meeting, banquet and ballroom areas.
- Assembly required versus pieces that arrive ready to place.
- How long goods are stored and how many deliveries are needed.
- Distance from Stockton to the property.
- Phasing: rooms released per day, night or weekend work, and blackout dates.
- Access: docks, elevators, stairs and staging space at the hotel.
- Jobsite labor requirements, and whether removal of the old furniture is included.
Request an FF&E installation bid
Areas served
We provide FF&E installation services across the California markets below. Each page covers local access, routes and scheduling for that area; share your property address to confirm availability.
San Francisco Bay Area
Monterey County
Sacramento and the Central Valley
Southern California
FF&E installation FAQ
Who are the FF&E installation companies in California that handle whole hotels?
Doneright installs complete hotel FF&E and OS&E packages across California, including guestrooms, lobbies, gyms, poolside areas, conference and banquet rooms, and ballrooms. We have been in business since 1998, have served hotels since 2000, and hold California contractor license #925457.
What do your FF&E installation services include?
Receiving and unloading, damage documentation, storage in our Stockton warehouse, delivery with our own trucks, unpacking, assembly and placement, room checks and punch. Removal of the old furniture can be added to the same scope.
Do you install OS&E as well as FF&E?
Yes. OS&E can be installed in the same scope as the FF&E, following the property's OS&E list and room layouts.
Can you unload 53-foot trailers and containers?
Yes. We unload 53-foot trailers and shipping containers at our Stockton warehouse, with forklifts on site, and photograph and document any damage when the freight arrives.
Can the hotel stay open during FF&E installation?
Yes. Installation follows the room-release schedule, so rooms come out of inventory in blocks and go back as they are installed and checked. Public spaces are scheduled around events and peak days.
How much does FF&E installation cost?
We do not publish prices. Cost depends on room count and room types, the number of items per room, storage time, delivery distance, phasing, access and jobsite labor requirements. Send the FF&E schedule and target dates and we will bid the project.
Request a bid
Send David the property name and address, the FF&E and OS&E schedules or item list, room count and room types, expected ship dates, the room-release plan and any blackout dates.